Shift Handover
A structured handover instead of 5 minutes at the door.
👥 PEOPLE & KNOWLEDGE
The late shift reports problems to the early shift, and the early shift stumbles into the same mistakes anyway - because the handover was "5 minutes at the door".
5-10
minutes per handover
1st hr
critical ramp-up phase
24/7
status transparent
What you document: a standardized handover checklist per line - order status, special conditions, problems, tool condition - plus a visual condition check (machine, material stock, cleaning) and the question of where to report and whom to inform.
⚠️
The trigger - how do you recognize it?
- Recurring problems appear in the first hour of the new shift
- Damage and anomalies are not communicated between shifts
- There is a handover book that is half-maintained - or not at all
- On order changes, the next shift loses time because it does not know the status
ℹ️
How it works with GIRI
QR code at the shift start point (handover board, control station). A structured instruction: what to check, what to document, what to hand over. Photo documentation of unusual conditions, links to open fault tickets.
💡
The value
- Less knowledge loss between shifts
- Faster shift start - the next shift knows immediately where things stand
- Recurring ramp-up problems disappear
- Damage is discovered earlier, not only after several shifts
💡
Typical users
- 3-shift operations
- Continuous production (chemicals, food)
- Highly automated lines with operator teams
- Logistics centers running 24/7
⚠️
What you want to avoid
- Treating the handover as a pure communication exercise - structure it with a visual instruction
- Making it too long - 5-10 minutes is the operational maximum
- Documenting only problems - "everything is running fine" is important information too
KPI figures are industry benchmarks (SwipeGuide), not a GIRI guarantee.